Phase one...the exterior
Phase two...the interior

The metal interior studs are being put in place.

All the interior walls are now in place.

The heating ducts are partially in place and the majority of the drywall is up.

The entry way is begining to take shape.

The interior lighting is up and connected.

The drop ceiling framework is in place.

Its been a long time, things have really progressed.

The kitchen is looking really great.

This is our floor tile.
Check back here often for more info on how we are doing,
what is being done, and all the other good details.